Your Design, Engineering & Permitting Team

For general contractors. We partner with contractors who need a reliable team for design, engineering, and permitting, so you can focus on building. Plans ready for city submittal in 2–3 weeks.

2025 03 18 1929 N New Hampshire Ave   Facade 2

Why contractors work with us

  • 2–3 week turnaround. Most standard projects are ready for their first city submittal within 2–3 weeks.
  • Everything under one roof. Architectural plans, structural engineering, MEP, Title 24 and permitting. One team, one point of contact.
  • Approval guarantee. We stand behind our work. If we can’t get your plans approved, you get your money back.
  • Quality & reliability. Quality work, clear communication and follow-through on every commitment.

Services

ADU – JADU

Accessory Dwelling Units

House Addition

Expand Your Living Space

Remodel

Reimagine Your Space

New Construction

Build Your Dream Home

Commercial Projects

Business Space Solutions

Multifamily Design

More Units, Smarter Layouts

The permit-ready package

Phase 1: Observation & Measurement (est. 1 week)

An initial site visit to document existing conditions and take precise field measurements, establishing accurate site documentation for design.


Phase 2: Architectural Design (est. 1–2 weeks)

  • Intentional design built around the project’s goals and direct client feedback.
  • 3 layout concepts, with up to 3 rounds of revisions and refinements.
  • Value engineering: designed from the beginning for structural efficiency and cost-effectiveness.
  • 3D renderings to explore spatial flow, materials and lighting.

Result: plans ready for city submittal in 2–3 weeks.


Phase 3: Structural & Technical Engineering (est. 1–2 weeks)

  • Structural engineering plans, connection details and load calculations.
  • Official engineering stamps from licensed professional engineers.
  • Title 24 energy compliance prepared in alignment with the architectural plans.

Phase 4: Permitting & City Approvals (timing varies by city)

  • City plan intake and initial plan check reviews.
  • Proactive management of plan check comments and revision cycles. Most Studio MOTH projects pass review in just 1–2 cycles.
  • Coordination with civil engineers, soils engineers and land surveyors when the project or city requires them.
  • Final approval: fully permitted drawings, ready for construction.
Studio MOTH permit-ready process in four steps: 1. Observation and measurement, about 1 week. 2. Architectural design, 1 to 2 weeks. Plans are ready for city submittal in 2 to 3 weeks after steps 1 and 2. 3. Structural and technical engineering, 1 to 2 weeks. 4. Permitting and city approvals, timing varies by city.

Have a job that needs permit-ready plans?

Send us the address and scope. We’ll walk you through the process and send a clear estimate.

Send Us a Job

Additional services

  • Photorealistic renderings: visualize design concepts and finishes.
  • Mood boards & concepts: define the aesthetic direction.
  • Specification schedules: comprehensive material and specification schedules for precise execution.
  • Interior design guidance: materials, finishes, fixtures and furnishings.
  • Construction oversight: on-site visits at construction milestones, design administration and project management.

Recent Projects

Let's Build Something Extraordinary

Ready to transform your vision into reality? Whether you're planning a new construction, renovation, or seeking architectural consultation, we're here to help bring your ideas to life.

Serving Los Angeles · San Diego · California & Nationwide