The permit-ready package
Phase 1: Observation & Measurement (est. 1 week)
An initial site visit to document existing conditions and take precise field measurements, establishing accurate site documentation for design.
Phase 2: Architectural Design (est. 1–2 weeks)
- Intentional design built around the project’s goals and direct client feedback.
- 3 layout concepts, with up to 3 rounds of revisions and refinements.
- Value engineering: designed from the beginning for structural efficiency and cost-effectiveness.
- 3D renderings to explore spatial flow, materials and lighting.
Result: plans ready for city submittal in 2–3 weeks.
Phase 3: Structural & Technical Engineering (est. 1–2 weeks)
- Structural engineering plans, connection details and load calculations.
- Official engineering stamps from licensed professional engineers.
- Title 24 energy compliance prepared in alignment with the architectural plans.
Phase 4: Permitting & City Approvals (timing varies by city)
- City plan intake and initial plan check reviews.
- Proactive management of plan check comments and revision cycles. Most Studio MOTH projects pass review in just 1–2 cycles.
- Coordination with civil engineers, soils engineers and land surveyors when the project or city requires them.
- Final approval: fully permitted drawings, ready for construction.