What’s Changing in 2027: Two ADUs, Smaller Lots, and New Options for Homeowners

•By STUDIO MOTH•7 min read

For decades, most California neighborhoods followed a simple rule: one lot, one house. That changed in 2021 with a state law called SB 9. It let homeowners do two new things:

  • Split their lot into two lots, each of which can be sold separately, and
  • Build up to two homes on each lot.

Your city has to approve these projects as long as they meet basic state rules. No public hearing, and no vote by neighbors or the city council.

Starting January 1, 2027, homeowners get even more options. In September 2026, Governor Gavin Newsom signed a wave of housing bills. These new laws don’t replace SB 9. They add new ways to build more homes on your property. They also cut some of the costs and make it harder for HOAs or slow permit reviews to hold up your project.

Here’s what’s changing, and what it could mean for you.

First, what’s staying the same

SB 9 itself isn’t changing. Its rules still apply:

  • You have to live there. If you split your lot, you must sign a statement promising to live in one of the homes for at least three years.
  • Two homes per lot. After a split, each new lot can have up to two homes, so four total.

What’s new in 2027 is that you no longer have to use SB 9 to add homes. Some of the new options come with fewer strings attached.

1. Two detached ADUs on a single-family lot (AB 956)

This is the headline change for most homeowners.

Until now, state law guaranteed you one new detached accessory dwelling unit (ADU) in your backyard. Starting in 2027, cities must approve two new detached ADUs on a lot with a single-family home, and as long as you meet the state’s basic rules, they can’t say no. There’s no public hearing.

What this means for you:

  • Each unit can be a real home. At up to about 800 square feet, that’s room for a comfortable one- or two-bedroom.
  • They fit in more backyards. The units can sit close to your property lines, so even modest lots may have room for two.
  • Your HOA can’t stop you. If your home is in an HOA, it can no longer block ADUs that follow state law.

Why it matters: You can keep your house and add two rental or family units, for three homes on one lot. You don’t need a lot split, a parcel map, or an owner-occupancy affidavit.

The catch: In most cases ADUs can’t be sold separately from the main house. Think of this path as building income or housing for family, not as a way to sell off part of your property.

2. Lower fees on smaller ADUs (SB 1117)

What are impact fees? When you add a new home, cities and local agencies charge one-time fees to help pay for the extra demand it puts on the community: parks, schools, roads, sewers, water and fire service. These are separate from your permit and plan-review fees, and they’re usually due before you get your building permit.

Each agency sets its own fee, often based on the size of the new unit. A single project can owe several of them, for parks, schools, traffic and utilities. Together they can add thousands of dollars to a project, or more in some cities, before construction even starts.

What’s changing: Starting in 2027, cities can charge impact fees only on the square footage above 750 square feet, and only in proportion to your main home. This applies to up to two ADUs per lot.

For example, an 800-square-foot ADU would be charged on just 50 square feet.

Design tip: 750 square feet is now a natural target size. A well-planned one-bedroom or compact two-bedroom fits that footprint and avoids most impact fees.

3. Smaller lots and starter homes (SB 1116)

SB 1116 makes major updates to California’s "starter home" law, which lets builders divide land into a handful of small lots for modest homes, with approval guaranteed if the project meets the rules. The 2027 changes make it much easier to use on single-family land:

  • Much smaller lots. A property can be divided into small lots for compact, separately owned homes.
  • More house on each lot. Cities can no longer require oversized yards or limit home sizes so much that small lots don’t work.
  • Teardowns count. A property with a rundown or fire-damaged house can now qualify, not just empty land.
  • Faster approvals. Cities have to act on the final paperwork within 60 days.
  • HOA rules can’t block it, with some exceptions.

It works on properties up to 1.5 acres in single-family neighborhoods. It’s most useful on larger or underused lots with room for several homes.

Why it matters: Unlike ADUs, these are separate lots you can sell. For owners of larger or underused parcels, that opens a path to building and selling a few modest homes.

Note: approvals under this law are temporarily paused in two Altadena ZIP codes through 2030.

4. A faster, more predictable permit process

Several new laws target the delays and surprises that inflate project costs:

  • No more endless plan-check rounds (AB 1621). Cities get two rounds of review. Inspectors also can’t demand changes to approved plans unless they document a real code problem or a specific safety issue.
  • Know your costs up front (SB 1014). You can ask the city for an estimate of required site improvements, like sidewalks or utility upgrades. Once your permit application is complete, the city must give you an itemized list and generally can’t add to it later.
  • Utility hookups in parallel (SB 1196). You can file your electrical service request at the same time as your building permit.
  • Remote inspections (AB 1738). Cities will have to offer virtual inspections for solar, batteries, heat pumps and reroofs on one- and two-unit homes, phasing in by 2028.

5. Prefab gets easier (AB 1815, AB 2058)

If you’re considering a factory-built or modular ADU, two changes help:

  • Cities can’t impose stricter local building standards on factory-built homes than state code requires. The exceptions are documented local hazards such as wildfire or flood risk.
  • Local permit and inspection fees for factory-built housing are capped at half of what a comparable site-built home would pay.

Combined with the two-ADU rule, this makes prefab backyard units more practical than ever.

The bottom line

SB 9 showed that a single-family lot could hold more than one home. The 2027 laws give homeowners even more choices: two ADUs without splitting your lot, smaller lots you can sell, lower fees, and a faster, more predictable permit process.

But the new rules come with fine print. What you can build depends on your lot, your city’s local rules and what you want to get out of your property. That’s where we come in.

Let’s talk about your property

At Studio MOTH, we follow these changes closely so you don’t have to. Whether you’re thinking about a backyard ADU, building for family, or getting more value out of your land, we can help you:

  • Find out what your lot can hold under the new 2027 rules
  • Choose the right path: ADUs, a lot split or small-lot homes
  • Design a home that works, sized to keep fees down and approvals smooth

Send us your property address and a short description of what you’d like to build. We’ll show you what’s possible under the new rules. 2027 is a great year to start planning.

This post is for general information and isn’t legal advice. Laws take effect January 1, 2027 unless otherwise noted, and local rules vary by city.